Strathtulloh Building
Inspections

Cracks in a new Strathtulloh home: settling or a defect?

How to tell normal settlement from a defect on reactive clay, and what a crack investigation measures.

Strathtulloh 3338 · 2026-05-04

In short: Some cracking in a new home on clay is expected. The question is when it crosses the line into a defect, and that is a matter of measurement.

Why new homes crack

Timber dries, plaster shrinks and clay ground moves through its first wet and dry seasons. Fine cracks at cornices and window corners in the first year or two are common.

When a crack becomes a defect

The Guide to Standards and Tolerances 2015 sets out when cracking in plaster, masonry and slabs is a defect, based on width and visibility. Measuring the crack is what moves the conversation from opinion to fact.

Patterns that point to movement

Diagonal cracks from window corners, doors that start binding and cracks that reopen after filling point to ground movement rather than shrinkage.

What drives movement on clay

Uneven moisture: downpipes discharging beside the footings, water pooling against the slab, or one side of the house watered heavily and the other left dry.

What we do

We map and measure cracks, check floor levels and plumb, look for drainage causes and record it all so the builder can respond.

Written by our local inspection team from work carried out in Strathtulloh. Licensed building practitioners, Building & Plumbing Commission registration CDB-U 53425.

Guides

More defect reports guides for Strathtulloh

All guides →

Book a building inspection in Strathtulloh

Instant online pricing, or talk to the booking team on 1300 471 805.

FAQ

Questions Strathtulloh owners ask about this

Will the builder fix settlement cracks?

Cracks within tolerance at the maintenance period are often patched. Cracks beyond tolerance are defects.

Should I fill cracks myself?

Photograph and measure them first, with dates, so there is a record.

Do you need an engineer?

For significant movement, yes. We tell you when an engineer's assessment is the next step.

How do I monitor a crack?

Mark its ends with a pencil and date, and photograph it with a ruler every few months.

CallGet a Free Quote