Planning your stage inspections on an Atherstone build
How to line up slab, frame, lock-up, waterproofing, fixing and PCI inspections on a new Strathtulloh home without missing a window.
At fixing the house is lined, doors and cabinets are in and the painter is next. We check finish and fit inside, and the brick cavity and drainage outside, before paint and paving cover them.
One of our inspectors will call you back. If it is urgent, call 1300 471 805.
The fixing items that matter most here are outside, not in. Mortar dropped into the cavity, weep holes blocked by render and ground left sitting against the slab all trap moisture next to a slab on reactive clay.



Annotated findings from Fixing inspections.




1Bored piersWith the piers drilled and the cages lowered in, before the concrete truck arrives
2Slab pre-pourOnce steel, pods and membrane are complete, the day before concrete
3FrameWith trusses fixed and before wall wrap or roof sarking closes it in
4Lock-up (pre-plaster)Roof, windows and brickwork in, plasterboard not yet delivered
6WaterproofingMembrane cured, tiler not yet on site
7Pre-handover (PCI)When the builder calls practical completion, before you sign or pay the final claim
How to line up slab, frame, lock-up, waterproofing, fixing and PCI inspections on a new Strathtulloh home without missing a window.

The vapour barrier under a slab is invisible for the life of the house. These are the membrane faults we find before Strathtulloh pours.

Trusses on the wrong wall, missing bracing rods and plates hanging off the slab. Why frame stage is about following the load to the ground.
Instant online pricing, or talk to the booking team on 1300 471 805.
Plasterboard finish, corners and cornices, door hanging and hardware by hand, joinery, stairs and handrails, window restrictors, and the external cavity, weep holes, gutters and grading.
Because it is the last time anyone can see down it. Mortar packed in the cavity bridges moisture across to the frame.
Openable bedroom windows above a certain height must not open more than 125mm, or must have protection, to stop children falling.
Not at this stage; the painter has not started. Paint finish is assessed at the PCI.
Yes. Items like cavity mortar and wall bow are much easier to fix before paint and paving.
One and a half to two hours.