In short: Each stage on an estate build is covered within days. A simple plan agreed with your supervisor at the start is what keeps every inspection on time.

Start with the construction program

Ask your builder for the construction program in writing when the contract is signed. It will not be exact, but it shows the order of stages and roughly how far apart they fall. Send it to us and we set up all the visits at once.

Agree a trigger for each stage

The most reliable system is a text from the site supervisor when steel is complete, trusses are fixed, the roof is closed, the membrane has cured and linings are up. Forward each one and we book the next day where possible.

Which stages carry the most risk

Slab and frame hold the structural items and are covered for good within days. Waterproofing is small but permanent once tiled. Those three plus the PCI are the core of any plan.

When dates move

Rain, materials and crews shift dates all the time. We rebook at short notice, so the worst outcome is not a late inspection but a skipped one because nobody passed on the message.

Keeping the paperwork together

Save each report with the matching progress claim. If a defect resurfaces years later, a dated report showing it was raised at the time is valuable.

Written by our local inspection team from work carried out in Strathtulloh. Licensed building practitioners, Building & Plumbing Commission registration CDB-U 53425.

Guides

More new construction stage inspections guides for Strathtulloh

All guides →

Book a building inspection in Strathtulloh

Instant online pricing, or talk to the booking team on 1300 471 805.

FAQ

Questions Strathtulloh owners ask about this

How many stage inspections are usual?

Most owners book five to seven, from slab through to the PCI.

Can I book all the stages in one go?

Yes. We schedule them provisionally and confirm each one when the supervisor tells you the stage is ready.

What if I miss a stage?

Book the next one. Some items from the missed stage may still be visible, and the report will say what could not be checked.

Do I pay each claim before the report?

Read the report first where you can. It is easier to have items fixed before a claim is paid.