Bored pier inspection in Strathtulloh

Where a lot needs piers under the slab, we check the drilled holes and the reinforcing cages before concrete fills them, because nothing about a pier can be checked afterwards.

  • With the piers drilled and the cages lowered in, before the concrete truck arrives
  • About 1 hour on site
  • Report within 24 hours
Request your quoteSend your details and a local inspector will ring you back.

No obligation. We use your details for your quote and may contact you about it even if you don't finish.

Fully licensed & accredited

Stage1 of 7
When to bookWith the piers drilled and the cages lowered in, before the concrete truck arrives
Time on siteAbout 1 hour on site
Inspected againstAS 2870, AS 3600, the geotechnical report and the engineer's footing design

What is included in a Strathtulloh bored piers inspection

  • Pier positions and spacing against the footing plan
  • Pier diameter checked at the top of each hole
  • Depth against the engineer's design and the soil report
  • Founding material at the base where visible
  • Reinforcement cage size, laps and starter bars
  • Cover to the cage and centralisers
  • Hole cleanliness, spoil and loose material
  • Standing water or seepage before the pour
  • Steel projection into the slab or beam
  • Termite and service penetrations near piers
  • Set-out against the site plan and boundaries
  • Records and photographs for the engineer where required
Why it matters here

Bored piers inspections on Strathtulloh builds

Piers carry a slab down through softer or variable ground to firmer material the engineer has nominated. On the western basalt plains that material, and the depth to reach it, changes from lot to lot, so each hole has to be compared with your own engineering rather than a typical figure.

What we find at this stage in Strathtulloh

  • Holes stopping short of the founding depth on the engineering
  • Loose soil or water left in the base of a hole
  • Cages sitting on the bottom instead of held off it
  • Too little concrete cover around the cage
  • Pier positions drifting from the set-out
  • Starter bars missing for the beams above

The other stages of a Strathtulloh build

  1. Slab pre-pour inspection in Strathtulloh2Slab pre-pourOnce steel, pods and membrane are complete, the day before concrete
  2. Frame inspection in Strathtulloh3FrameWith trusses fixed and before wall wrap or roof sarking closes it in
  3. Lock-up (pre-plaster) inspection in Strathtulloh4Lock-up (pre-plaster)Roof, windows and brickwork in, plasterboard not yet delivered
  4. Fixing inspection in Strathtulloh5FixingLinings, doors and joinery in, painter not yet started
  5. Waterproofing inspection in Strathtulloh6WaterproofingMembrane cured, tiler not yet on site
  6. Pre-handover (PCI) inspection in Strathtulloh7Pre-handover (PCI)When the builder calls practical completion, before you sign or pay the final claim

All construction stage inspections in Strathtulloh →

Guides

Construction stage guides for Strathtulloh

All guides →

Book a bored piers inspection in Strathtulloh

Instant online pricing, or talk to the booking team on 1300 471 805.

FAQ

Bored piers inspections in Strathtulloh: common questions

Does every Strathtulloh house need piers?

No. Many slabs on these estates are designed without them. Your engineering drawings show whether piers are required and where.

What do you measure?

Hole depth, diameter and spacing against the engineering, the condition of the base, cage size and position, and cover to the steel.

Can piers be inspected after the pour?

Not in any useful way. Once concrete is in, depth and cage placement cannot be confirmed, which is why this visit has to be on the day.

How far ahead should the pier check be booked?

One or two days' notice generally works. Tell us the drilling date and we hold a slot for the afternoon.

What if a hole is not deep enough?

The report records it with a photo and the engineering requirement, and the builder re-drills or calls the engineer before pouring.

Is the pier check part of the slab inspection?

It can be booked together if piers and slab steel are ready the same day, but usually they are separate visits a few days apart.