Planning your stage inspections on an Atherstone build
How to line up slab, frame, lock-up, waterproofing, fixing and PCI inspections on a new Strathtulloh home without missing a window.
The practical completion inspection is the full walk through of your finished home before you sign off. We list every defect against your contract and the tolerances guide so it can be fixed before handover.
One of our inspectors will call you back. If it is urgent, call 1300 471 805.
On recent Strathtulloh handovers the items that would cost most to leave are hidden: exhaust ducts ending in the roof space, cut sarking, flashing junctions left open. The visible list of paint and grout matters too, but those three are why we always go up through the manhole.



Annotated findings from Pre-handover (PCI) inspections.




1Bored piersWith the piers drilled and the cages lowered in, before the concrete truck arrives
2Slab pre-pourOnce steel, pods and membrane are complete, the day before concrete
3FrameWith trusses fixed and before wall wrap or roof sarking closes it in
4Lock-up (pre-plaster)Roof, windows and brickwork in, plasterboard not yet delivered
5FixingLinings, doors and joinery in, painter not yet started
6WaterproofingMembrane cured, tiler not yet on site
How to line up slab, frame, lock-up, waterproofing, fixing and PCI inspections on a new Strathtulloh home without missing a window.

The vapour barrier under a slab is invisible for the life of the house. These are the membrane faults we find before Strathtulloh pours.

Trusses on the wrong wall, missing bracing rods and plates hanging off the slab. Why frame stage is about following the load to the ground.
Instant online pricing, or talk to the booking team on 1300 471 805.
We inspect every room, the roof space, the exterior and the site, and record each defect with a photo and the standard or contract item it fails.
Yes if you can. We show you the key items and explain which matter most.
That is your decision and depends on your contract. Our list gives you a clear record of what remains.
No. The building surveyor issues it. Ask the builder for a copy before handover.
Items outside the tolerances guide usually are. The report separates them from the ones that matter for weather and structure.
Plan on two to three hours on site for a typical estate house.