Pipes through the plastic: slab membrane faults on Strathtulloh pours
Unsealed punctures, untaped pipes and a barrier that stops short of the beam. Three vapour barrier faults found before Strathtulloh slabs were poured.
What our inspectors are finding on Strathtulloh jobs, written up as we go.
One of our inspectors will call you back. If it is urgent, call 1300 471 805.

Unsealed punctures, untaped pipes and a barrier that stops short of the beam. Three vapour barrier faults found before Strathtulloh slabs were poured.

A cavity packed with mortar at fixing stage and weep holes less than 50mm above paving at handover. How brick walls lose their drainage on new Strathtulloh homes.
Instant online pricing, or talk to the booking team on 1300 471 805.